FREE Shipping For Orders Over £250
Trustpilot: 5 Star Reviews
Stock Items ship in 48 hours

BLK BOX Utility Gym Flooring Roll – 8mm

SKU: 33-0312

The BLK BOX Utility Gym Flooring Roll 8mm provides high compression resistance and impact strength and is a great option for all home gyms. The Utility Gym Flooring Roll will protect your equipment when dropped and protect the floor below. 

Construction

The 8mm gym roll is constructed from SBR rubber with EDPM granules bonded with PUR which is highly compression resistant and provides a noise reduction of 18 decibels.

Sound Reduction and Protection

Free weight and lifting areas, whether at home or in the gym, are often subject to persistent impact. Gym flooring must therefore reduce sound and vibration to minimise disruption to surrounding areas. It must also offer protection to your equipment and subfloor in case of any drops or accidents. The BLK BOX Utility Gym Flooring Roll - 8mm offers a shock absorption of 18.5% (tested to EN14808), and a 18dB sound reduction.

Installation

Before installation, it is important to make sure the floor is level, firm, absorbent as well as dry and clean. Repair any cracks and irregularities in the floor. Turn off underfloor heating 24 hours prior to installation and at least 48 hours after. Rolls must be acclimatised for 24 hours prior to laying and can be cut to size using a share bladed knife or carpet cutter. These rolls are to be installed using an adhesive to bond to the floor, we recommend a 2-K PU adhesive. Before adhesive has cured, roll over the flooring with a pressure roller, rubbing the header joints and seams.

Cleaning

The tiles are easily cleaned and can be vacuumed and mopped. We do no recommend machine cleaning or using solvent-based cleaning agents. Always use a neutral pH cleaner and warm water Check out our how-to guide here for cleaning rubber gym flooring. 


Length 10,000mm
Width 1250mm
Height 8mm
Material SBR rubber with EDPM granules bonded with PUR 
Density  980kg/m3 
Ultimate tensile strength 1.8N/mm2 
Shock absorption 18.5% (Tested to EN 14904) 
Sound reduction 18dB
Compression 9% DVR with a compression of 25% (Tested to ISO 815)
Thermal Conductivity 0.17W/(mK) (Tested to EN 12667)
Dynamic Coefficient of Friction 0.57
Tolerances
  • ± 1.5% length and width 
  • ± 5% on thickness 

What size is each roll?

Each roll is 10,000mm (10m) long and 1250mm (1.25m) wide. Thickness is 8mm.

How is this installed?

Preparation:

  • Ensure the subfloor is level, firm, absorbent as well as dry and clean 
  • Repair any cracks and irregularities in the floor  
  • Ensure floor heating is switched off 24 hours prior to installation, and at least 48 hours after (or adhesive curing time, whichever is longer) 
  • Rolls must be acclimatised for 24 hours prior to laying 
  • Lay out rolls for several hours before final laying and cutting 

Installation: 

  • Inside of the roll is the top layer 
  • Always start at the same wall 
  • Joints must be flush when laying  
  • Welding of the seams is not necessary 
  • Use an adhesive to bond the roll to the floor, we recommend a 2-K PU adhesive
  • Before adhesive has cured, roll over the floor with a pressure roller, rubbing the header joints and seams as required 
  • Roll can be cut with a sharp bladed knife or carpet cutter 

How are these flooring rolls cleaned?

This flooring roll is easily cleaned and maintained. We would advise not using a machine or any solvent based cleaners. Always use a neutral pH cleaner and warm water. Just after installation, we would advise using a degreaser to clean the floor. Check out our gym tile cleaning guide here for more info.

We aim to dispatch and deliver all in stock items within 2-10 working days depending on your location in the UK & Ireland.


DELIVERY & TRACKING

We ship our orders via Parcel / 2 Man Delivery or Pallet depending on the size of your order and shipping fees will be calculated at checkout. To track your order click here for orders placed online; Track an Online Order and here for orders placed via our Sales team; Track an Offline Order


PALLET DELIVERY

All deliveries are kerbside, it will be your responsibility to remove the items from the pallet on arrival and dispose of the pallet. You will receive an email from our Logistics team with a date of delivery. If you require an alternative delivery date or if there are any access restrictions to your property, please let us know within 24 hours before delivery by emailing team@blkboxfitness.com. Please be aware failure to do so may result in additional delivery charges.


MANUFACTURED ITEMS

Some of our training equipment is manufactured here in our HQ. The lead times on these products range from 10-25 working days and are identified by having the MADE IN BELFAST badge.


RETURNS

We understand at times due to size, colour or type some items might not be the right fit for you. We are happy to accept a returned item within 30 days from the date of you receiving the item for a refund or exchange.


To start a return click here; BLK BOX Returns



Trustpilot

Stay in the Loop

Net Orders Checkout

Item Price Qty Total
Subtotal £0.00
Shipping
Total

Shipping Address

Shipping Methods

x